A clearer RFQ.
A more useful reply.
Work through the checklist below before submitting. If a detail is not yet known, tell us what still needs to be resolved.
Sampling, tooling and production planning
Typical sampling lead time, including tooling, is approximately 10–15 days. The confirmed schedule follows drawing review and agreement on material, geometry, surface treatment and inspection requirements. Clarify the starting milestone in the quotation. Repeat-production delivery is quoted separately for the quantity and approved route.
Send a drawing revision, sample quantity, expected order volume and the intended application. Identify functional dimensions and required documents so the technical review can resolve the important details before tooling and sample approval.